Removing obsolete hardware without downtime

How did AllianceEPC replace obsolete turbine generator controls without additional downtime?

The challenge

This particular client owns and operates a 15 MWatt steam turbine/generator which was being controlled by an obsolete Rockwell PLC/5 system.

After being contracted to perform a turnkey control system upgrade, AllianceEPC designed and implemented the new control system to replace the outdated one.  AllianceEPC installed a Rockwell ControlLogix PLC and updated the existing Bentley-Nevada machine protection system.

The AllianceEPC team designed, provided, and programmed the new ControlLogix system, conducted the FAT testing at our facility with the client, and provided construction oversight to assist with the installation and wiring of the new system. We then performed all pre-startup checks as well as the final startup and commissioning of the Cogen system. 

the Results

  • Installed and assisted the client to ensure confidence in the new systems
  • Performed all pre-startup/final checks of the Cogen system 
  • AllianceEPC was able to perform a turnkey control system upgrade for the client during a planned turbine overhaul for maximum productivity

 
Alliance Engineers & Project Consultants is a multi-disciplined EPCM firm with expertise in 3D Laser Scanning and Point-Cloud Design Technology.  We assist clients throughout North American by leveraging this technology to transform their project delivery process while setting new standards in innovative engineering and project solutions.